The steel we make goes into providing enduring strength and flexibility in building infrastructure projects that are key to India’s aspirations for sustainable development and inclusive progress. With a proven track record in expanding capacities–upstream and downstream–through organic and inorganic initiatives, we have now embarked on an expansion path that will almost double our capacity in the next decade.
With a strong focus on building brands and increasing sales of Value-Added and Special Products (VASP), we are adding downstream capacities in the areas where India is growing.
The Mumbai-Ahmedabad High Speed Rail (MAHSR) Corridor is the first of the 12 lines planned by the government. It will cover more than 500km in 2 hours and 58 minutes with a maximum speed of 320km/hour. With an estimated steel consumption of 2.5 MnT, the MAHSR project, when completed, will become the highest steel-consuming infrastructure project in India. JSW Steel provides high-strength TMT Bars, HR Plates and LRPC for the MAHSR project and has become one of the preferred and leading suppliers with an over 50% contribution
Of Railway Freight Corridors (Mumbai- Haryana WDFC and Ludhiana-West Bengal EDFC)
Of Metro line (Mumbai, Pune, Nagpur, Bengaluru, Ahmedabad, Chennai, Indore, Kochi and Delhi) Projects
Of water pipelines projects across major projects
Of pipelines across major projects
International airport
For Kudankulam, Tarapur, Kakrapar power projects
Contribution to Solar Energy Projects
Contribution to Wind Energy Projects
Of roads
Of bridges